Irrigation Engineering Regime conditions in a channel may occur if All listed here Silt grade and silt charge are constant Discharge is constant Channel flows uniformly in incoherent alluvium as that transported in suspension All listed here Silt grade and silt charge are constant Discharge is constant Channel flows uniformly in incoherent alluvium as that transported in suspension ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Main purpose of mean water training for rivers is Flood control All of these To preserve the channel in good shape by efficient disposal of suspended and bed load To provide sufficient depth of water in navigable channels, during low water periods Flood control All of these To preserve the channel in good shape by efficient disposal of suspended and bed load To provide sufficient depth of water in navigable channels, during low water periods ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering As compared to gravity dams, earthen dams are costlier require sound rock foundations require less skilled labour are less susceptible to failure are costlier require sound rock foundations require less skilled labour are less susceptible to failure ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in super passage and canal syphon aqueduct and super passage level crossing aqueduct and syphon aqueduct super passage and canal syphon aqueduct and super passage level crossing aqueduct and syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a divide wall is to prevent river floods from entering the canal control the silt entry in the canal separate the undersluices from weir proper provide smooth flow at sufficiently low velocity prevent river floods from entering the canal control the silt entry in the canal separate the undersluices from weir proper provide smooth flow at sufficiently low velocity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The discharge passing over an ogee spillway is given by (where, L is effective length of spillway crest and H is the total head over the spillway crest including velocity head.) CLH3/2 CHL3/2 CLH1/2 CLH5/2 CLH3/2 CHL3/2 CLH1/2 CLH5/2 ANSWER DOWNLOAD EXAMIANS APP