Irrigation Engineering Regime conditions in a channel may occur if Discharge is constant Silt grade and silt charge are constant All listed here Channel flows uniformly in incoherent alluvium as that transported in suspension Discharge is constant Silt grade and silt charge are constant All listed here Channel flows uniformly in incoherent alluvium as that transported in suspension ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If water table is comparatively high, the irrigation canal becomes useless, due to Uncertain water demand Large amount of seepage Water logging of the cultivated areas All of these Uncertain water demand Large amount of seepage Water logging of the cultivated areas All of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A runoff river plant is a low head scheme a high head scheme a medium head scheme None of these a low head scheme a high head scheme a medium head scheme None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of water required to bring the soil moisture content of a given soil upto its field capacity is called soil moisture deficiency equivalent moisture hygroscopic water pellicular water soil moisture deficiency equivalent moisture hygroscopic water pellicular water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For an annual flood series arranged in descending order of magnitude, the return for a magnitude listed at position period m in a total data N is m/(N+l) m/N (N+l)/m N/(m+l) m/(N+l) m/N (N+l)/m N/(m+l) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Pick up the correct statement from the following and answer In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing All of these In a level crossing a regulator is provided across the drainage at its down-stream In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing, a cross regulator is provided on the canal below the crossing All of these ANSWER DOWNLOAD EXAMIANS APP