Power Systems Which of the following is a reaction turbines Francis turbine and Kaplan turbine. None of these. Kaplan and Pelton turbine. Pelton turbine and Francis turbine. Francis turbine and Kaplan turbine. None of these. Kaplan and Pelton turbine. Pelton turbine and Francis turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Alternate formation and breakage of bubbles are called water hamming. surgfication. cavitations. All of these water hamming. surgfication. cavitations. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Water hamming process in pen-stocks results in pressure increases. None of these noise increases, pressure increases, velocity decreases. noise increases. pressure increases. None of these noise increases, pressure increases, velocity decreases. noise increases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 2.044 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. 2.044 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Kaplan. Francis. Impeller. Pelton. Kaplan. Francis. Impeller. Pelton. ANSWER DOWNLOAD EXAMIANS APP