Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 4.06 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. 2.044 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. 2.044 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by decreasing reactance value either 1 or 2 increasing voltage level nether 1 nor 2 decreasing reactance value either 1 or 2 increasing voltage level nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ideal plant load cfactor is greater than 1 0 1 less than 1 greater than 1 0 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for miniature circuit breaker. minimum capacity breaker. maximum capacity breaker. molded circuit breaker. miniature circuit breaker. minimum capacity breaker. maximum capacity breaker. molded circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect will not occur in which of the following transmission lines long transmission lines medium transmission lines short transmission lines All of these long transmission lines medium transmission lines short transmission lines All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems On what factors does the selection of a water turbine depend Speed. Working head. Nature of load. All of above. Speed. Working head. Nature of load. All of above. ANSWER DOWNLOAD EXAMIANS APP