Irrigation Engineering Pick up the correct sequence of the part of a canal system from the following Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Heads works-branch canal-main canal distributary, minor Head work-distributary-branch canal-minor Head works-main canal-branch canal-minor-distributary Head works-main canal-branch canal-distributary-minor Heads works-branch canal-main canal distributary, minor Head work-distributary-branch canal-minor ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Study the following statements.i) Levees are constructed parallel to river flow,ii) Spurs are constructed parallel to river flow,iii) Levees are constructed transverse to river flow,iv) Spurs are constructed transverse to river flow.The correct answer is (i) and (iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i) and (iv) (i) and (ii) (ii) and (iii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Optimum depth of kor watering for rice is 215 mm 135 mm 165 mm 190 mm 215 mm 135 mm 165 mm 190 mm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When the reservoir is full, the maximum compressive force in a gravity dam is produced at centre of base within the middle third of base at the toe at the heel at centre of base within the middle third of base at the toe at the heel ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The meander pattern of a river is developed by Critical discharge Average discharge Maximum discharge Dominant discharge Critical discharge Average discharge Maximum discharge Dominant discharge ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal is carried over a natural drainage, the structure provided, is known as Aqueduct Syphon Super passage Syphon-aqueduct Aqueduct Syphon Super passage Syphon-aqueduct ANSWER DOWNLOAD EXAMIANS APP