Irrigation Engineering
In case of a trapezoidal notch fall

All listed here
Splay downstream from the notch section is 22½°
Top length of the piers should not be less than their thickness
Splay upstream from the notch section is 45°

ANSWER DOWNLOAD EXAMIANS APP

Irrigation Engineering
Pick up the correct sequence of the part of a canal system from the following

Head works-main canal-branch canal-minor-distributary
Heads works-branch canal-main canal distributary, minor
Head work-distributary-branch canal-minor
Head works-main canal-branch canal-distributary-minor

ANSWER DOWNLOAD EXAMIANS APP