Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1850/R 1750/R 1700/R 1600/R 1850/R 1750/R 1700/R 1600/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements: Automatic signalling system results in 1. greater risk 2. higher efficiency 3. avoidance of block instruments 4. higher operating cost Of these statements 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct 1 and 4 are correct I and 2 are correct 3 and 4 are correct 2 and 3 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle is the angle between the gauge face of the stock rail and outer face of the tongue rail the outer face of the stock rail and tongue rail the gauge face of the stock rail and tongue rail the outer face of the stock rail and the gauge face of the tongue rail the gauge face of the stock rail and outer face of the tongue rail the outer face of the stock rail and tongue rail the gauge face of the stock rail and tongue rail the outer face of the stock rail and the gauge face of the tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Stretcher bar is provided To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is both (i) and (iii) (i), (ii) and (iii) both (i) and (ii) only (i) both (i) and (iii) (i), (ii) and (iii) both (i) and (ii) only (i) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP