Highway Engineering Nagpur road plan formula were prepared by assuming radial or star and grid road pattern rectangular or block road pattern radial or star and block road pattern radial or star and circular road pattern radial or star and grid road pattern rectangular or block road pattern radial or star and block road pattern radial or star and circular road pattern ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the left side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left diverging to the right side and merging from right diverging to the left side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left diverging to the right side and merging from right ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as None of these parapet wall retaining wall breast wall None of these parapet wall retaining wall breast wall ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 mm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm its penetration value is 8 mm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering RC-2, MC-2 and SC-2 correspond to None of these viscosity in decreasing order from RC-2 to SC-2 same viscosity viscosity in increasing order from RC-2 to SC-2 None of these viscosity in decreasing order from RC-2 to SC-2 same viscosity viscosity in increasing order from RC-2 to SC-2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is heavy diesel light diesel kerosene oil gasoline heavy diesel light diesel kerosene oil gasoline ANSWER DOWNLOAD EXAMIANS APP