Power Systems More efficient plants are used as both 1 and 2 peak load plant None of these base load plant both 1 and 2 peak load plant None of these base load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The internal flux linkage due to internal flux of a conductor is All of these I/6*10-7 wb-T/m I/4*10-7 wb-T/m I/2*10-7 wb-T/m All of these I/6*10-7 wb-T/m I/4*10-7 wb-T/m I/2*10-7 wb-T/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems Installation of capacitors at suitable locations and of optimum size in a distribution system results in reduction in distribution power loss improved voltage regulation All of these reduction of KVA rating of distribution transformers reduction in distribution power loss improved voltage regulation All of these reduction of KVA rating of distribution transformers ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Generator. Ash handling plant. Turbine. Coal handling plant. Generator. Ash handling plant. Turbine. Coal handling plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Rankine cycle efficiency of a steam power plant is of 60 - 80 %. 45 - 80 %. 20 - 30 %. 30 - 45 %. 60 - 80 %. 45 - 80 %. 20 - 30 %. 30 - 45 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is nuclear plant thermal plant hydro power plant pumped storage plant nuclear plant thermal plant hydro power plant pumped storage plant ANSWER DOWNLOAD EXAMIANS APP