Power Systems More efficient plants are used as base load plant peak load plant both 1 and 2 None of these base load plant peak load plant both 1 and 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 1.20. 0.90. 0.75. 1.05. 1.20. 0.90. 0.75. 1.05. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Bonding is done at the both ends of the cable to reduce the sheath loss None of these copper loss iron loss sheath loss None of these copper loss iron loss ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. 14 %. 28 %. None of above 56 %. 14 %. 28 %. None of above ANSWER DOWNLOAD EXAMIANS APP
Power Systems An hydro-graph indicates the average run off during the period. the maximum and minimum run off during the period. All of these the discharge at any time during the period under consideration. the average run off during the period. the maximum and minimum run off during the period. All of these the discharge at any time during the period under consideration. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plant capacity factor value is greater than 1 0 1 less than 1 greater than 1 0 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP