Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 250 MW 750 MW 1250 MW 500 MW 250 MW 750 MW 1250 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draft tube is provided to reduce the effect of water hammer. None of these increase the acting head on the water wheel. raise the water surface of the stream to create an artificial head. reduce the effect of water hammer. None of these increase the acting head on the water wheel. raise the water surface of the stream to create an artificial head. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes runners is Francis Pelton Impeller Kaplan Francis Pelton Impeller Kaplan ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conductor of a 10 Km long single phase, two wire line are separated by a distance of 1.5 m the diameter of each conductor the inductance of the circuit is 25.8 mH. 23.33 mH. 23.8 mH. 21.2 mH. 25.8 mH. 23.33 mH. 23.8 mH. 21.2 mH. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a AC transmission line either 1 or 2 DC transmission line None of these AC transmission line either 1 or 2 DC transmission line None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal power plants the size of coal after crushing 200 - 205 mm. 20 - 25 mm. 40 mm. 300 mm. 200 - 205 mm. 20 - 25 mm. 40 mm. 300 mm. ANSWER DOWNLOAD EXAMIANS APP