Engineering Economics
Pick up the correct reason for making conceptual (or preliminary) estimate from the following:

To compute target estimate for the owner while drawing and specifications are in initial stage
All of these
To check quotations from contractors and/or sub-contractors
To have a check on a definitive cost estimate

ANSWER DOWNLOAD EXAMIANS APP

Engineering Economics
Current ratio is:

(Current assets + loans)/Current liabilities
Current assets/Current liabilities
None of these
(Current assets + loans advances)/Current liabilities

ANSWER DOWNLOAD EXAMIANS APP

Engineering Economics
The institute of Electronics and Communications Engineers of the Philippines (IECEP) is planning to put up its own building. Two proposals being considered are:A. The construction of the building now to cost P 400,000B. The construction of a smaller building now to cost P300,000 and at the end of 5 years, an extension to be added to cost P 200,000.By how much is proposal B more economical than proposal A if interest rate is 20% and depreciation to be neglected?