Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching oil. vacuum. SF6. air blast. oil. vacuum. SF6. air blast. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An impulse turbine is most suited for low head and high discharge power plants. makes use of a draft tube. always operates submerged. operates by initial complete conversion to kinetic energy. is most suited for low head and high discharge power plants. makes use of a draft tube. always operates submerged. operates by initial complete conversion to kinetic energy. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is 1 None of these -1 0 1 None of these -1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems When reactance grounding is used in network, the voltage between neutral and ground is IR0 × Xn 3×IR0 × Xn both 1 and 3 IN × Xn IR0 × Xn 3×IR0 × Xn both 1 and 3 IN × Xn ANSWER DOWNLOAD EXAMIANS APP
Power Systems The maximum demand of a consumer is 2 kW and corresponding daily energy consumption is 30 units. What is the corresponding load factor? 50.5% 75% 25% 62.5% 50.5% 75% 25% 62.5% ANSWER DOWNLOAD EXAMIANS APP
Power Systems If a fault occurs on any feeder, the fault current is none of these. much higher than with unsectional bus bar. equal to unsectional bus bar. much lower than with unsectional bus bar. none of these. much higher than with unsectional bus bar. equal to unsectional bus bar. much lower than with unsectional bus bar. ANSWER DOWNLOAD EXAMIANS APP