Irrigation Engineering Horizontal acceleration due to earthquake results in inertia force into the body of the dam None of these both (A) and (B) hydrodynamic pressure inertia force into the body of the dam None of these both (A) and (B) hydrodynamic pressure ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The stream which does not have any base flow contribution is called None of these ephemeral stream perennial stream intermittent stream None of these ephemeral stream perennial stream intermittent stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of rice root zone, is 50 cm 90 cm 80 cm 60 cm 50 cm 90 cm 80 cm 60 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls Of height ⅓rd to ¼th the depth of water in the main canal Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick All listed here Of height ⅓rd to ¼th the depth of water in the main canal Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called gross speed design speed operating speed rated speed gross speed design speed operating speed rated speed ANSWER DOWNLOAD EXAMIANS APP