Irrigation Engineering The net speed under which the turbine reaches its peak efficiency is called design speed gross speed operating speed rated speed design speed gross speed operating speed rated speed ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Borrow pits should preferably be located in Field on the left side of the canal Fields on both sides of the canal Field on the right side of the canal Central half width of the section of the canal Field on the left side of the canal Fields on both sides of the canal Field on the right side of the canal Central half width of the section of the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Presence of tail water in a gravity dami) increases the principal stressii) decreases the principal stressiii) increases the shear stressiv) decreases the shear stressThe correct answer is (ii) and (iii) (i) and (iii) (ii) and (iv) (i)and(iv) (ii) and (iii) (i) and (iii) (ii) and (iv) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of the discharge over a trapezoidal crest to a rectangular crest of Sarda falls of identical parameters, is 1.074 1.084 1.054 1.064 1.074 1.084 1.054 1.064 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following can be used as a meter fall ? flumed glacis fall All of these unflumed glacis fall vertical drop fall flumed glacis fall All of these unflumed glacis fall vertical drop fall ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Lacey's equation for calculating flood discharge in rivers, is V = 10.8 R2/3 S1/3 V = 10.8 R2/3 S1/2 V = 10.8 R1/3 S2/3 V = 10.8 R1/2 S1/2 V = 10.8 R2/3 S1/3 V = 10.8 R2/3 S1/2 V = 10.8 R1/3 S2/3 V = 10.8 R1/2 S1/2 ANSWER DOWNLOAD EXAMIANS APP