Irrigation Engineering Pick up the correct statement from the following and answer All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream All of these In a level crossing, a cross regulator is provided on the canal below the crossing In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal In a level crossing a regulator is provided across the drainage at its down-stream ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Coefficient of discharge of an ogee spillway depends on downstream apron interference and downstream submergence depends on depth of approach and upstream slope remains constant both (A) and (B) depends on downstream apron interference and downstream submergence depends on depth of approach and upstream slope remains constant both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A fall in a canal bed is generally provided, if Ground slope exceeds the designed bed slope Designed bed slope exceeds the ground slope None of these Ground slope is practically the same as the designed bed slope Ground slope exceeds the designed bed slope Designed bed slope exceeds the ground slope None of these Ground slope is practically the same as the designed bed slope ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering As compared to crest of the normal portion of the weir, the crest of the under sluice portion of weir is kept at higher level lower level same level any of the above depending on the design higher level lower level same level any of the above depending on the design ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If H and d are the water depth and drop in the bed level at a Sarda fall, the width B of the trapezoidal crest, is given by B = 0.44 √(H + d) B = 0.33 √(H + d) B = 0.55 √(H + d) B = 0.22 √(H + d) B = 0.44 √(H + d) B = 0.33 √(H + d) B = 0.55 √(H + d) B = 0.22 √(H + d) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a divide wall is to provide smooth flow at sufficiently low velocity prevent river floods from entering the canal control the silt entry in the canal separate the undersluices from weir proper provide smooth flow at sufficiently low velocity prevent river floods from entering the canal control the silt entry in the canal separate the undersluices from weir proper ANSWER DOWNLOAD EXAMIANS APP