Irrigation Engineering The main function of a divide wall is to separate the undersluices from weir proper prevent river floods from entering the canal provide smooth flow at sufficiently low velocity control the silt entry in the canal separate the undersluices from weir proper prevent river floods from entering the canal provide smooth flow at sufficiently low velocity control the silt entry in the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For designing the venturi head, All listed here Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm Width of the throat should not be less than one-third of the bed width of main canal All listed here Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm Width of the throat should not be less than one-third of the bed width of main canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering With the increase in the quantity of water supplied, the yield of most crops increases upto a certain limit and then becomes constant decreases continuously increases continuously increases upto a certain limit and then decreases increases upto a certain limit and then becomes constant decreases continuously increases continuously increases upto a certain limit and then decreases ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The width of a meander belt is the transverse distance between Apex point of one curve and apex point of the reserve curve Apex point and the crossing Two banks of meandering river None of these Apex point of one curve and apex point of the reserve curve Apex point and the crossing Two banks of meandering river None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Height of bank Berm Free board None of these Height of bank Berm Free board None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? ultra-sonic method moving boat method area-velocity method slope-area method ultra-sonic method moving boat method area-velocity method slope-area method ANSWER DOWNLOAD EXAMIANS APP