Irrigation Engineering The difference in level between the top of a bank and supply level in a canal, is called Berm Height of bank None of these Free board Berm Height of bank None of these Free board ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be 1 + (0.9)010 1 – (0.9)°l0 1/(1-0.9°10) 1/(1+ 0.9010) 1 + (0.9)010 1 – (0.9)°l0 1/(1-0.9°10) 1/(1+ 0.9010) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To estimate the magnitude of a flood with a return period of T years, Gumbel’s distribution method requires the following data pertaining to annual flood seriesi) mean valueii) standard deviationiii) length of recordiv) coefficient of skewThe correct answer is (i), (ii), (iii) and (iv) (i) and (ii) (i),(ii) and (iii) (i), (ii) and (iv) (i), (ii), (iii) and (iv) (i) and (ii) (i),(ii) and (iii) (i), (ii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable material for the central impervious core of a zoned embankment type dam is clay mixed with fine sand silty clay clay coarse sand clay mixed with fine sand silty clay clay coarse sand ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The rainfall on five successive days were measured as 100 mm, 80 mm, 60 mm, 40 mm and 20 mm respectively. If the infiltration index or the storm loss rate for the catchment area is earlier estimated as 50 mm/day, the total surface run off will be 90 mm 60 mm 50 mm 140 mm 90 mm 60 mm 50 mm 140 mm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The flow of water after spilling over the weir crest in chute spillway and side channel spillway respectively are At right angle and parallel to weir crest At right angle to weir crest in both Parallel to weir crest in both Parallel and at right angle to weir crest At right angle and parallel to weir crest At right angle to weir crest in both Parallel to weir crest in both Parallel and at right angle to weir crest ANSWER DOWNLOAD EXAMIANS APP