Industrial Engineering and Production Management A critical activity has Minimum slack Zero slack Maximum slack Average slack Minimum slack Zero slack Maximum slack Average slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In order that linear programming techniques provide valid results Relations between factors must be linear (negative) Either (A) or (B) Relations between factors must be linear (positive) Only one factor should change at a time, others remaining constant Relations between factors must be linear (negative) Either (A) or (B) Relations between factors must be linear (positive) Only one factor should change at a time, others remaining constant ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is defined as Only normal time for an operation Normal time + allowances Normal time + idle time Normal time + idle time + allowances Only normal time for an operation Normal time + allowances Normal time + idle time Normal time + idle time + allowances ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In a PERT chart Only critical activities are numbered Only important activities should be numbered All activities should be numbered Only selected activities are numbered Only critical activities are numbered Only important activities should be numbered All activities should be numbered Only selected activities are numbered ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Slack of various events on the critical path in PERT/CPM chart Remain constant May increase or decrease depending on various factors Increases continuously Decreases continuously Remain constant May increase or decrease depending on various factors Increases continuously Decreases continuously ANSWER DOWNLOAD EXAMIANS APP