Industrial Engineering and Production Management In a PERT chart Only critical activities are numbered Only selected activities are numbered All activities should be numbered Only important activities should be numbered Only critical activities are numbered Only selected activities are numbered All activities should be numbered Only important activities should be numbered ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In perpetual inventory control, the material is checked as it reaches its Minimum value Maximum value Middle value Average value Minimum value Maximum value Middle value Average value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Inventory management consists of Stock control system Effective running of stores State of merchandise methods of storing and maintenance etc. All of these Stock control system Effective running of stores State of merchandise methods of storing and maintenance etc. All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management An event is indicated on the network by A straight line with circles at the ends A dotted line A straight line A number enclosed in a circle or a square A straight line with circles at the ends A dotted line A straight line A number enclosed in a circle or a square ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following plans motivates supervisors by paying a premium on time saved by workers? Halsey plan Emerson's plan Haynes plan Rowan plan Halsey plan Emerson's plan Haynes plan Rowan plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Break-even analysis can be used for There is no such criterion Long run analysis Average of above two run analysis Short run analysis There is no such criterion Long run analysis Average of above two run analysis Short run analysis ANSWER DOWNLOAD EXAMIANS APP