Industrial Engineering and Production Management 'O' on a PERT/CPM chart represents An event to be transferred to other network chart An ordinary event A significant event representing some milestone Dangling event An event to be transferred to other network chart An ordinary event A significant event representing some milestone Dangling event ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is equal to (Normal time) + (allowances) Normal time taken by an operation (Normal time) - (allowances) Representative time multiplied by rating factor (Normal time) + (allowances) Normal time taken by an operation (Normal time) - (allowances) Representative time multiplied by rating factor ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to Muther, the basic principle of best layout is Principle of overall integration All of the listed here Principle of flow Principle of flexibility Principle of overall integration All of the listed here Principle of flow Principle of flexibility ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The probability distribution of activity times in PERT follows following distribution Normal Beta Exponential Binomial Normal Beta Exponential Binomial ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The most important function of inventory control is Stock control system All of these Technical responsibility for the state of materials To run the stores effectively Stock control system All of these Technical responsibility for the state of materials To run the stores effectively ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT is applied for Installation of machinery Marketing programmes and advertising programmes All of these Research and development of products Installation of machinery Marketing programmes and advertising programmes All of these Research and development of products ANSWER DOWNLOAD EXAMIANS APP