Industrial Engineering and Production Management 'O' on a PERT/CPM chart represents Dangling event An event to be transferred to other network chart An ordinary event A significant event representing some milestone Dangling event An event to be transferred to other network chart An ordinary event A significant event representing some milestone ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The aim of value engineering is to All of these Find the depreciation value of a machine Minimize the cost without change in quality of the product Determine the selling price of a product All of these Find the depreciation value of a machine Minimize the cost without change in quality of the product Determine the selling price of a product ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time of completing a project in network analysis is given by following time of the critical activity meeting at the final triode Late finish Late start Early start Early finish Late finish Late start Early start Early finish ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In a functional organisation Quality of work is better Specialized knowledge and guidance to individual worker is provided Wastage of material is minimum All of these Quality of work is better Specialized knowledge and guidance to individual worker is provided Wastage of material is minimum All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A systematic job improvement sequence will consist of Job enrichment Motion study All of these Time study Job enrichment Motion study All of these Time study ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Consumes neither time nor resources Is a dangling event Consumes resources but no time Consumes time, but no resources Consumes neither time nor resources Is a dangling event Consumes resources but no time Consumes time, but no resources ANSWER DOWNLOAD EXAMIANS APP