Industrial Engineering and Production Management The difference between the time available to do the job and the time required to do the job, is known as Constraint Float Event Duration Constraint Float Event Duration ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In A-B-C analysis, which class of items are generally large in number? A C B None of these A C B None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which one of the following chart gives simultaneously information about the progress of work and machine loading? Man-machine chart Gantt chart Process chart Machine load chart Man-machine chart Gantt chart Process chart Machine load chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is An event can't be accomplished until activities leading to it are completed All of the these No activity from any event can be started from preceding event till it is completed Length of arrow has nothing to do with time An event can't be accomplished until activities leading to it are completed All of the these No activity from any event can be started from preceding event till it is completed Length of arrow has nothing to do with time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following layouts is suited for mass production? Process layout Product layout Plant layout Fixed position layout Process layout Product layout Plant layout Fixed position layout ANSWER DOWNLOAD EXAMIANS APP