Power Systems In thermal plant most of the energy is wasted in ESP turbines boiler condenser ESP turbines boiler condenser ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer in a transmission line can be obtained by reducing reactance either 1 or 2 increasing voltage level None of these reducing reactance either 1 or 2 increasing voltage level None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Cheapest plant in operation and maintenance is hydroelectric. steam power. nuclear. diesel power. hydroelectric. steam power. nuclear. diesel power. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 200 km operating at frequency of 10 Hz Hz. Find the type of the line medium transmission line long transmission line any of the above short transmission line medium transmission line long transmission line any of the above short transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by increasing of voltage level increasing of capacitance value increasing of inductance value both 1 and 2 increasing of voltage level increasing of capacitance value increasing of inductance value both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following relationships are not valid for short transmission lines A = D = 1 Is = Ir B = C = Z All of these A = D = 1 Is = Ir B = C = Z All of these ANSWER DOWNLOAD EXAMIANS APP