Power Systems In thermal plant most of the energy is wasted in condenser turbines boiler ESP condenser turbines boiler ESP ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inertia constant of 100 MVA, 50 Hz, 4 pole generator is 10 MJ/MVA. If the mechanical input to the machine is suddenly raised from 50 MW to 75 MW, the rotor acceleration will be equal to 12.5 electrical degrees/s² 225 electrical degrees/s² 125 electrical degrees/s² 22.5 electrical degrees/s² 12.5 electrical degrees/s² 225 electrical degrees/s² 125 electrical degrees/s² 22.5 electrical degrees/s² ANSWER DOWNLOAD EXAMIANS APP
Power Systems The modern trend in electric power generation to have large number of small size thermal plants located at different places. none of above. to have large size thermal plant located near coal fields. to have large size thermal plants near load centre. to have large number of small size thermal plants located at different places. none of above. to have large size thermal plant located near coal fields. to have large size thermal plants near load centre. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For symmetrical network, the neutral current is any of the above maximum zero infinity any of the above maximum zero infinity ANSWER DOWNLOAD EXAMIANS APP
Power Systems An isolated synchronous generator with transient reactance equal to 0.1 pu on a 100 MVA base is connected to the high voltage bus through a step up transformer of reactance 0.1 pu on a 100 MVA base. The fault level at the bus is 400 MVA 500 MVA 200 MVA 100 MVA 400 MVA 500 MVA 200 MVA 100 MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems Half life is defined as the time required for full of atoms in a specimen disintegrate. the time required to spiliting of a heavy nucleus. the time required for one half of isotope to decay. none of above. the time required for full of atoms in a specimen disintegrate. the time required to spiliting of a heavy nucleus. the time required for one half of isotope to decay. none of above. ANSWER DOWNLOAD EXAMIANS APP