Building Construction In places where the soil is soft and has small resistance to the flow of concrete, which one of the following types of piles, is used Pedestal pile Pressure pile Franki pile Vibro pile Pedestal pile Pressure pile Franki pile Vibro pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as Laying Placing Grouting Troweling Laying Placing Grouting Troweling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 14 days 1 day 4 days 7 days 14 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called Queen closer King closer Half brick Bevelled closer Queen closer King closer Half brick Bevelled closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The position of a brick when laid on its side 9 cm × 9 cm with its frog in the vertical plane, is called Brick on bed Brick held vertically Brick on edge Brick on end Brick on bed Brick held vertically Brick on edge Brick on end ANSWER DOWNLOAD EXAMIANS APP
Building Construction The projections of head or sill of a door or window frame are Chocks Transoms Stops Horns Chocks Transoms Stops Horns ANSWER DOWNLOAD EXAMIANS APP