Industrial Engineering and Production Management In perpetual inventory control, the material is checked as it reaches its Maximum value Minimum value Middle value Average value Maximum value Minimum value Middle value Average value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The technique of value analysis can be applied to Any item Crash programmer items only Simple items only Complicated items only Any item Crash programmer items only Simple items only Complicated items only ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.84 0.66 0.95 0.5 0.84 0.66 0.95 0.5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The average time recorded by work study man for an operation is called Representative time Normal time Standard time None of these Representative time Normal time Standard time None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Positive slack on a PERT indicates that project is Ahead of schedule On critical path As per schedule Beyond schedule Ahead of schedule On critical path As per schedule Beyond schedule ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The simplex method is the basic method for Model analysis Operation research Linear programming Value analysis Model analysis Operation research Linear programming Value analysis ANSWER DOWNLOAD EXAMIANS APP