Industrial Engineering and Production Management Work study is most useful Where production activities are involved In judging the rating of machines In improving industrial relations In judging the output of a man and improving it Where production activities are involved In judging the rating of machines In improving industrial relations In judging the output of a man and improving it ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management What does symbol 'V' employ in work study Delay/ temporary Storage Operation Permanent storage Inspection Delay/ temporary Storage Operation Permanent storage Inspection ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is 100 25 50 75 100 25 50 75 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) There is no such criterion CAM = DAM CAM > DAM CAM < DAM There is no such criterion CAM = DAM CAM > DAM CAM < DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In A-B-C analysis, which class of items are generally large in number? None of these A B C None of these A B C ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the Sales revenue line Variable cost line Fixed cost line Total cost line Sales revenue line Variable cost line Fixed cost line Total cost line ANSWER DOWNLOAD EXAMIANS APP