Industrial Engineering and Production Management Work study is most useful Where production activities are involved In judging the rating of machines In improving industrial relations In judging the output of a man and improving it Where production activities are involved In judging the rating of machines In improving industrial relations In judging the output of a man and improving it ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management What does symbol 'V' employ in work study Operation Delay/ temporary Storage Permanent storage Inspection Operation Delay/ temporary Storage Permanent storage Inspection ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The two bin system is concerned with Ordering procedure Production planning Despatching and expediting Forecasting sales Ordering procedure Production planning Despatching and expediting Forecasting sales ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be TR + (S - T) × R TR + [(S - T)/2] × R TR + [(S - T)/S] × R TR TR + (S - T) × R TR + [(S - T)/2] × R TR + [(S - T)/S] × R TR ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time which results in the least possible direct cost of an activity is known as Standard time Normal time Slow time Crash time Standard time Normal time Slow time Crash time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The most important objective behind plant layout is Overall simplification, safety of integration To provide conveniently located shops Maximum travel time in plant Economy in space Overall simplification, safety of integration To provide conveniently located shops Maximum travel time in plant Economy in space ANSWER DOWNLOAD EXAMIANS APP