Power Systems In order to have lower cost of power generaion the load factor and diversity factor should be low the load factor should be low but diversity factor should be high The load factor and diversity factor should be high the load factor should be high but diversity factor should be low the load factor and diversity factor should be low the load factor should be low but diversity factor should be high The load factor and diversity factor should be high the load factor should be high but diversity factor should be low ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of fuse wire is always expressed in kWh. ampere-hours. ampere-volts. amperes. kWh. ampere-hours. ampere-volts. amperes. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The use of high speed circuit breakers decrease system stability. increased the short circuit current. improves system stability. reduces the short circuit current. decrease system stability. increased the short circuit current. improves system stability. reduces the short circuit current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? any voltage above 33 kV 31.35 to 34.65 kV 33 to 50 kV 25 to 35 kV any voltage above 33 kV 31.35 to 34.65 kV 33 to 50 kV 25 to 35 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inductance of single phase two wire line is given by 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 0.4×10-7× ln(d/r') H/m 0.4×10-7× ln(r'/d) H/m 4×10-7× ln(r'/d) H/m 4×10-7× ln(d/r') H/m 0.4×10-7× ln(d/r') H/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear power plant are used as peak load plants. intermediate load plants. none of above. base load plants. peak load plants. intermediate load plants. none of above. base load plants. ANSWER DOWNLOAD EXAMIANS APP