Power Systems
A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system?

 14.7 mA.
 1 A.
  14.76 A.
 1.476 A.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Half life is defined as

  the time required for one half of isotope to decay.
 none of above.
 the time required for full of atoms in a specimen disintegrate.
 the time required to spiliting of a heavy nucleus.

ANSWER DOWNLOAD EXAMIANS APP