The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be

 9.936 pu
 10.936 pu
 7.936 pu
 8.936 pu

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
ACSR means

 Aluminium copper steel reinforced
 all conductor steel reinforced
 Aluminium conductor steel reinforced
 Aluminium core steel reinforced