Building Construction In clay soil All listed here Consolidation continues even after several years of construction Swelling and shrinkage characteristics prevail Differential settlement is generally prevalent All listed here Consolidation continues even after several years of construction Swelling and shrinkage characteristics prevail Differential settlement is generally prevalent ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following rocks is used for monumental buildings? Sand stone Marble Slate Granite Sand stone Marble Slate Granite ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a rectangular foundation of width b, eccentricity of load should not exceed b/3 b/4 b/2 b/6 b/3 b/4 b/2 b/6 ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 18 24 12 25 18 24 12 25 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The construction joints in buildings are provided after 10 m 20 m 40 m 15 m 10 m 20 m 40 m 15 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 40 to 65 mm 65 to 100 mm 25 mm 25 to 40 mm 40 to 65 mm 65 to 100 mm 25 mm 25 to 40 mm ANSWER DOWNLOAD EXAMIANS APP