Building Construction Grillage foundation Is used to transfer heavy structural loads from steel columns to a soil having low bearing capacity Does not require deep cutting as the required base area with required pressure intensity is obtained at a shallow depth All listed here Is light and economical Is used to transfer heavy structural loads from steel columns to a soil having low bearing capacity Does not require deep cutting as the required base area with required pressure intensity is obtained at a shallow depth All listed here Is light and economical ANSWER DOWNLOAD EXAMIANS APP
Building Construction Couple roof is used for spans 6.5 m but less than 8 m 3.5 m but less than 5 m 3.5 m or less 5 m but less than 6.5 m 6.5 m but less than 8 m 3.5 m but less than 5 m 3.5 m or less 5 m but less than 6.5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction Dutch bond is a modification of Single Flemish bond Header bond English bond Stretcher bond Single Flemish bond Header bond English bond Stretcher bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The thickness of a reinforced brick partition wall, is generally kept 20 cm 5 cm 10 cm 15 cm 20 cm 5 cm 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to stretcher course, the thickness of joints in header course should be Less Equal More Equal or more Less Equal More Equal or more ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time The maximum projection of the corbel should not be more than the thickness of the wall Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of each corbel course should be limited to a quarter brick at a time ANSWER DOWNLOAD EXAMIANS APP