Power Systems If we increase the spacing between the phase conductors, the value of line inductance decrease increase None of these remains unaffected decrease increase None of these remains unaffected ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pumped storage plant is a None of these base load plant both 1 and 2 peak load plant None of these base load plant both 1 and 2 peak load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the pressure inside the turbine casing remains. firm capacity of plant is increased. kinetic energy of the running water is fully utilized. operating head is controlled. pressure inside the turbine casing remains. firm capacity of plant is increased. kinetic energy of the running water is fully utilized. operating head is controlled. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Blocking factor Gauss constant Lagrange multiplier Acceleration factor Blocking factor Gauss constant Lagrange multiplier Acceleration factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydro power stations what is an enlarged body of water just above the intake and used as a regulating reservoir called Fore bay. Reservoir. Spillways. Penstock. Fore bay. Reservoir. Spillways. Penstock. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ratio of reset to pick up current for an induction cup relay is approximately 0.99. 1.35. 0.75. 1.0. 0.99. 1.35. 0.75. 1.0. ANSWER DOWNLOAD EXAMIANS APP