Waste Water Engineering If the depletion of oxygen is found to be 5 ppm after incubating a 2.5% solution of sewage sample for 5 days at 21°C, B.O.D. of the sewage is 50 ppm 200 ppm 100 ppm 150 ppm 50 ppm 200 ppm 100 ppm 150 ppm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 160 cm 140 cm 100 cm 120 cm 160 cm 140 cm 100 cm 120 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal value of over flow rates for plain primary sedimentation tanks, ranges between 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of a sewer is 150 mm, the gradient required for generating self cleansing velocity, is 1 in 120 1 in 100 1 in 60 None of these 1 in 120 1 in 100 1 in 60 None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 1 hour 30 minutes 2 hours 1 hour and 30 minutes 1 hour 30 minutes 2 hours 1 hour and 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Large diameter sewers subjected to external pressure alone, are reinforced Near the inner surface of the pipe Near the outer surface of the pipe With elliptical cage Both A and B Near the inner surface of the pipe Near the outer surface of the pipe With elliptical cage Both A and B ANSWER DOWNLOAD EXAMIANS APP