Waste Water Engineering Large diameter sewers subjected to external pressure alone, are reinforced With elliptical cage Near the inner surface of the pipe Near the outer surface of the pipe Both A and B With elliptical cage Near the inner surface of the pipe Near the outer surface of the pipe Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge per person per year, is 10 litres 15 litres 25 litres 20 litres 10 litres 15 litres 25 litres 20 litres ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In areas where rainy season is limited to a few months, the type of sewerage system recommended is Combined system None of these Partially separate system Separate system Combined system None of these Partially separate system Separate system ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 2 minutes 3 minutes 5 minutes 1 minute 2 minutes 3 minutes 5 minutes 1 minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 25 to 50 m 50 m to 100 m 150 m to 300 m 100 m to 150 m 25 to 50 m 50 m to 100 m 150 m to 300 m 100 m to 150 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For estimating the peak run off the rational formula Q = 0.0278 KpA was evolved by Frubling Kinchling All listed here Lloyd Davis Frubling Kinchling All listed here Lloyd Davis ANSWER DOWNLOAD EXAMIANS APP