Waste Water Engineering If the diameter of a sewer is 150 mm, the gradient required for generating self cleansing velocity, is 1 in 120 1 in 100 1 in 60 None of these 1 in 120 1 in 100 1 in 60 None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is done with an admixture of previously aerated sludge Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is continued till stability Aeration is done with an admixture of previously aerated sludge Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is continued till stability ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known None of these Dissolved Oxygen (D.O.) Chemical Oxygen Demand (C.O.D.) Bio-Chemical Oxygen Demand (B.O.D.) None of these Dissolved Oxygen (D.O.) Chemical Oxygen Demand (C.O.D.) Bio-Chemical Oxygen Demand (B.O.D.) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 4 m 3 m 4.5 m 3.5 m 4 m 3 m 4.5 m 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank A particle to travel along its length ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to determine Settleable solids None of these Suspended solids Dissolved solids Settleable solids None of these Suspended solids Dissolved solids ANSWER DOWNLOAD EXAMIANS APP