Waste Water Engineering If is the rugosity coefficient, is the bed slope of sewer, the velocity of flow in m/sec may be obtained by the formula V = (1/n) r2/3 s1/2 evolved by Bazin Kutter Chezy Manning Bazin Kutter Chezy Manning ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, Flow velocity 0.15 m to 0.3 m/sec is kept All of these One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept Flow velocity 0.15 m to 0.3 m/sec is kept All of these One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The clarigesters are Circular Imhoff double storey tanks without bottom hoppers Circular septic tanks Rectangular septic tanks Circular Imhoff double tanks with bottom hoppers Circular Imhoff double storey tanks without bottom hoppers Circular septic tanks Rectangular septic tanks Circular Imhoff double tanks with bottom hoppers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a continuous flow type of sedimentation tanks All listed here Maximum horizontal flow velocity is limited to 0.3 m/minute Width of the tank is normally kept about 6 m Length of the tank is normally kept 4 to 5 times the width All listed here Maximum horizontal flow velocity is limited to 0.3 m/minute Width of the tank is normally kept about 6 m Length of the tank is normally kept 4 to 5 times the width ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is Acid fermentation None of these Acid regression Alkaline fermentation Acid fermentation None of these Acid regression Alkaline fermentation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer ventilating columns are generally placed at All listed here Every change in the size of sewers Upper ends of branch sewers Distances 150 m to 300 m All listed here Every change in the size of sewers Upper ends of branch sewers Distances 150 m to 300 m ANSWER DOWNLOAD EXAMIANS APP