Waste Water Engineering In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept 0.25 10 2 5 0.25 10 2 5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is 2.30 m 2.40 m 2.45 m 2.50 m 2.30 m 2.40 m 2.45 m 2.50 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of minimum hourly flow to the average flow of sewage is 43832 43834 43833 43894 43832 43834 43833 43894 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Discrete or granular particles change their Weight Shape None of these Size Weight Shape None of these Size ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer manholes are generally provided at The junctions of sewers The change of direction All of these The change of gradient The junctions of sewers The change of direction All of these The change of gradient ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design purposes, the normal rate of infiltration of ground water into the sewer, is 2000 litres/km/cm 1000 litres/km/cm 500 litres/km/cm 1500 litres/km/cm 2000 litres/km/cm 1000 litres/km/cm 500 litres/km/cm 1500 litres/km/cm ANSWER DOWNLOAD EXAMIANS APP