Waste Water Engineering
The sewers

Must be of adequate size to avoid over flow
Must flow under gravity ½ to ¾ full
Must be laid at least 2 to 3 m deep to collect /water from the basements
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In case of sewer lines

All listed here
Water test is carried out to check water tightness of the joints
Obstruction test is carried out with the help of smooth ball of diameter 13 mm
Test for straightness is carried out with the help of a lamp and mirror