Waste Water Engineering For evaporation and measurement of settable solids, the apparatus used, is A test tube A breaker An Imhoff cone A jar A test tube A breaker An Imhoff cone A jar ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ‘Cowl’ is provided at Lower end of ventilating column Upper end of the manhole First step in manhole Upper end of ventilating column Lower end of ventilating column Upper end of the manhole First step in manhole Upper end of ventilating column ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is 30 m 20 m 75 m 45 m 30 m 20 m 75 m 45 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 5 minutes 2 minutes 3 minutes 1 minute 5 minutes 2 minutes 3 minutes 1 minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Fresh sewage may become stale in Two to three hours Three to four hours One hour Six hours Two to three hours Three to four hours One hour Six hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 1 hour and 30 minutes 1 hour 30 minutes 2 hours 1 hour and 30 minutes 1 hour 30 minutes 2 hours ANSWER DOWNLOAD EXAMIANS APP