Waste Water Engineering The settlement velocity of a solid (diameter 0.5 mm, specific gravity 1.75) in water having temperature 10°C, is 413.5 cm/sec 500 cm/sec 213.5 cm/sec 313.5 cm/sec 413.5 cm/sec 500 cm/sec 213.5 cm/sec 313.5 cm/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Removal of oil and grease from sewage, is known Screening Filtration Skimming None of these Screening Filtration Skimming None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a continuous flow type of sedimentation tanks Maximum horizontal flow velocity is limited to 0.3 m/minute Width of the tank is normally kept about 6 m All listed here Length of the tank is normally kept 4 to 5 times the width Maximum horizontal flow velocity is limited to 0.3 m/minute Width of the tank is normally kept about 6 m All listed here Length of the tank is normally kept 4 to 5 times the width ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 3 to 5 1 5 to 10 2 to 3 3 to 5 1 5 to 10 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Acid regression stage of sludge digestion at a temperature 21°C extends over a period of 60 days 30 days 15 days 90 days 60 days 30 days 15 days 90 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The factor responsible for purification of sewage in river is Temperature Dissolved oxygen in water All listed here Hydrology Temperature Dissolved oxygen in water All listed here Hydrology ANSWER DOWNLOAD EXAMIANS APP