Power Systems Gas turbine power plants for maximum efficient may have All of above. Heat exchangers. Reheating. Multistage compression. All of above. Heat exchangers. Reheating. Multistage compression. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging current of a 400 kV line is more than that of a 220 kV line of the same length? True False None of these either 1 or 2 True False None of these either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where is the draft tube of a hydroelectric plant that is an airtight pipe located In between the penstock and runner. Near the surge tank. In between the runner exhaust and the tail race. At the beginning of the penstock. In between the penstock and runner. Near the surge tank. In between the runner exhaust and the tail race. At the beginning of the penstock. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is hydro power plant nuclear plant pumped storage plant thermal plant hydro power plant nuclear plant pumped storage plant thermal plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The unit protection scheme provides primary protection. remote protection. simultaneous protection. back up protection. primary protection. remote protection. simultaneous protection. back up protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Making and breaking currents of 3 phase AC circuit breakers in power system are respectively in what form? RMS and RMS value any of the above Instantaneous and RMS value RMS and Instantaneous value RMS and RMS value any of the above Instantaneous and RMS value RMS and Instantaneous value ANSWER DOWNLOAD EXAMIANS APP