Power Systems For transmission line which one of the following relation is true? AD + BC = 0 AD - BC = -1 AD - BC = 1 AD - BC = 0 AD + BC = 0 AD - BC = -1 AD - BC = 1 AD - BC = 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 800 MJ stored energy in the rotor at synchronous speed, what is the inertia constant H for a 50 Hz, four pole turbo generator rated 100 MVA, 11 kV? 4 MJ/MVA 6 MJ/MVA 8 MJ/MVA 2 MJ/MVA 4 MJ/MVA 6 MJ/MVA 8 MJ/MVA 2 MJ/MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 1.20. 1.05. 0.75. 0.90. 1.20. 1.05. 0.75. 0.90. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power system consists of 300 buses out of which 20 buses are generator buses, 25 buses are the ones with reactive power support buses and 15 buses are ones with fixed shunt capacitors. All the other buses are load buses. It is proposed to perform a load flow analysis for the system using Newton-Raphson Jacobian matrix is 540×540 553×553 554×554 555×555 540×540 553×553 554×554 555×555 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the relation between sub transient (X"), transient (X') and synchronous reactance (X) ? X" < X' > X X" > X' >X X" > X' < X X" < X' < X X" < X' > X X" > X' >X X" > X' < X X" < X' < X ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 720 MW. 730 MW. 710 MW. 740 MW. 720 MW. 730 MW. 710 MW. 740 MW. ANSWER DOWNLOAD EXAMIANS APP