Waste Water Engineering For non-scouring velocity 5 m/sec, the type of sewers generally preferred to, is Cement concrete sewers Stone ware sewers Glazed bricks sewers Cast iron sewers Cement concrete sewers Stone ware sewers Glazed bricks sewers Cast iron sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Unexpected increase in the population Unexpected large scale infiltration of stream water Under estimates of maximum and average flows All of these Unexpected increase in the population Unexpected large scale infiltration of stream water Under estimates of maximum and average flows All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Oxidation process results in the formation of All of these Sulphates Nitrates Carbon dioxide All of these Sulphates Nitrates Carbon dioxide ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is Siphon spill way Overflow weir Leaping weir None of these Siphon spill way Overflow weir Leaping weir None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D2/3 = 4 b2/3 D3/8 = 4 b3/8 D8/3 = 4 b8/3 D3/2 = 4 b3/2 D2/3 = 4 b2/3 D3/8 = 4 b3/8 D8/3 = 4 b8/3 D3/2 = 4 b3/2 ANSWER DOWNLOAD EXAMIANS APP