Waste Water Engineering In detritus tanks, Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec All listed here Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec All listed here Detention period is kept 3 to 4 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Carbondioxide is formed Nitrates are formed Ammonia is formed Nitrites are formed Carbondioxide is formed Nitrates are formed Ammonia is formed Nitrites are formed ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by Glazed stonewares R.C.C. Cast iron P.C.C. Glazed stonewares R.C.C. Cast iron P.C.C. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed 1.5 2.5 3 2 1.5 2.5 3 2 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Lead acetate test in sewer manhole is done to test the presence of Diesel vapours Hydrogen sulphide Carbondioxide gas Methane gas Diesel vapours Hydrogen sulphide Carbondioxide gas Methane gas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 50 m to 100 m 100 m to 150 m 150 m to 300 m 25 to 50 m 50 m to 100 m 100 m to 150 m 150 m to 300 m 25 to 50 m ANSWER DOWNLOAD EXAMIANS APP