Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The water carried sewerage system removes Domestic sewage All listed here Storm sewage Industrial sewage Domestic sewage All listed here Storm sewage Industrial sewage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope 1 in 10 1 in 15 1 in 5 1 in 20 1 in 10 1 in 15 1 in 5 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dilution method of disposing of sewage, is not preferred to When diluting water has high dissolved oxygen content When diluting water is used for water supply near the point of sewage disposed When sewage is fresh When the diluting water is having flow currents When diluting water has high dissolved oxygen content When diluting water is used for water supply near the point of sewage disposed When sewage is fresh When the diluting water is having flow currents ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pathogens (or pathogenic bacterias) in water may cause All listed here Cholera Dysentery Typhoid All listed here Cholera Dysentery Typhoid ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following resists hydrogen sulphide corrosion? Glazed ware R.C.C. Asbestos cement Glazed stone wares Glazed ware R.C.C. Asbestos cement Glazed stone wares ANSWER DOWNLOAD EXAMIANS APP