Waste Water Engineering Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for Under estimates of maximum and average flows Unexpected increase in the population All of these Unexpected large scale infiltration of stream water Under estimates of maximum and average flows Unexpected increase in the population All of these Unexpected large scale infiltration of stream water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Sediments Bacterias Suspended solids Hardness Sediments Bacterias Suspended solids Hardness ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer ventilating columns are generally placed at Every change in the size of sewers All listed here Distances 150 m to 300 m Upper ends of branch sewers Every change in the size of sewers All listed here Distances 150 m to 300 m Upper ends of branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 60 days 10 days 30 days 20 days 60 days 10 days 30 days 20 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The non-clog pump which permits solid matter to pass out with the liquid sewage, is Centrifugal pump Reciprocating pump None of these Pneumatic ejector Centrifugal pump Reciprocating pump None of these Pneumatic ejector ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 7 m 5 m 5.5 m 6.5 m 7 m 5 m 5.5 m 6.5 m ANSWER DOWNLOAD EXAMIANS APP