Waste Water Engineering Sewer pipes need be checked for Maximum flow Both A and B None of these Minimum flow Maximum flow Both A and B None of these Minimum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Sludge is activated by constant stirring Water is removed by centrifugal action Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Sludge is activated by constant stirring Water is removed by centrifugal action ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal value of over flow rates for plain primary sedimentation tanks, ranges between 50,000 to 60,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge per person per year, is 10 litres 20 litres 25 litres 15 litres 10 litres 20 litres 25 litres 15 litres ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The intensity of rain is expressed in cm/hour cm/day cm/minute None of these cm/hour cm/day cm/minute None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For the COD test of sewage, organic matter is oxidised by K₂Cr₂O₇ in the presence of HCl None of these HNO₃ H₂SO₄ HCl None of these HNO₃ H₂SO₄ ANSWER DOWNLOAD EXAMIANS APP