Waste Water Engineering Sewer pipes need be checked for Maximum flow None of these Both A and B Minimum flow Maximum flow None of these Both A and B Minimum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For drainage pipes in buildings the test applied before putting them to use, is Water test Smoke test All listed here Straightness test Water test Smoke test All listed here Straightness test ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Design period of 40 to 50 years is adopted for Trunk sewers Main sewers Branch sewers All listed here Trunk sewers Main sewers Branch sewers All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk and out-fall, the type of sewers generally used, is Parabolic shaped Horse shoe shaped Standard egg shaped Circular shaped Parabolic shaped Horse shoe shaped Standard egg shaped Circular shaped ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 30 minutes 1 hour and 30 minutes 1 hour 2 hours 30 minutes 1 hour and 30 minutes 1 hour 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Large diameter sewers subjected to external pressure alone, are reinforced Both A and B With elliptical cage Near the outer surface of the pipe Near the inner surface of the pipe Both A and B With elliptical cage Near the outer surface of the pipe Near the inner surface of the pipe ANSWER DOWNLOAD EXAMIANS APP