Building Construction For heavy embankments and dams, of height h, the depth of exploration of soil should not be less than 1/2h 2 h h/4 h 1/2h 2 h h/4 h ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Upto ceiling from the ground level Between ceiling and ground level Between ceiling and floor level Upto roof above ground level Upto ceiling from the ground level Between ceiling and ground level Between ceiling and floor level ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pick up the correct specification of one-room quarters generally adopted from the following: Six quarters in a row The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m The front verandah is kept 2 m wide All listed here Six quarters in a row The size of room is either 3.5 m × 3 m or 4.2 m × 2.5 m The front verandah is kept 2 m wide All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Sound insulation All of these Heat insulation Prevention of dampness Sound insulation All of these Heat insulation Prevention of dampness ANSWER DOWNLOAD EXAMIANS APP
Building Construction An ordinary concrete may be made water proof by adding Pudlo All of these Snowcem Impermo Pudlo All of these Snowcem Impermo ANSWER DOWNLOAD EXAMIANS APP
Building Construction The black cotton soil Shrinks excessively when dry Swells excessively when wet Undergoes volumetric changes All of these Shrinks excessively when dry Swells excessively when wet Undergoes volumetric changes All of these ANSWER DOWNLOAD EXAMIANS APP