Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level Between ceiling and ground level Upto roof above ground level Between ceiling and floor level Upto ceiling from the ground level Between ceiling and ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Raft footing Pier footing Combined footing Strap footing Raft footing Pier footing Combined footing Strap footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 25 to 30 cm 15 to 20 cm 30 to 45 cm 5 to 10 cm 25 to 30 cm 15 to 20 cm 30 to 45 cm 5 to 10 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Workability Stability of structure All listed here Strength Workability Stability of structure All listed here Strength ANSWER DOWNLOAD EXAMIANS APP
Building Construction The thickness of a reinforced brick partition wall, is generally kept 15 cm 5 cm 10 cm 20 cm 15 cm 5 cm 10 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction Sum of tread and rise must lie between 500 to 550 mm 600 to 650 mm 400 to 450 mm 300 to 350 mm 500 to 550 mm 600 to 650 mm 400 to 450 mm 300 to 350 mm ANSWER DOWNLOAD EXAMIANS APP