Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and ground level Between ceiling and floor level Upto ceiling from the ground level Upto roof above ground level Between ceiling and ground level Between ceiling and floor level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 14 days 7 days 1 day 4 days 14 days 7 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction The nominal thickness of one brick wall in mm, is 90 mm 150 mm 200 mm 190 mm 90 mm 150 mm 200 mm 190 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The important test to be conducted on a stone used in docks and harbors is Hardness test Toughness test Weight test Workability test Hardness test Toughness test Weight test Workability test ANSWER DOWNLOAD EXAMIANS APP
Building Construction The lower half portion between crown and skew back of the arch, is called Soffit Springing Haunch Spandril Soffit Springing Haunch Spandril ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical sides of a door and window openings provided in a wall, are known as Jambs None of these Reveals Verticals Jambs None of these Reveals Verticals ANSWER DOWNLOAD EXAMIANS APP