Waste Water Engineering For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is 18 cm 10 cm 12 cm 15 cm 18 cm 10 cm 12 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 4 years 3.5 years 3 years 5 years 4 years 3.5 years 3 years 5 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In 1000 kg of sewage, the total solids approximate 7.5 kg to 10 kg 5 kg to 7.5 kg 0.5 to 1.0 kg 1 kg to 2.0 kg 7.5 kg to 10 kg 5 kg to 7.5 kg 0.5 to 1.0 kg 1 kg to 2.0 kg ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 2 to 3 5 to 10 3 to 5 1 2 to 3 5 to 10 3 to 5 1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The quantity of liquid waste which flows in sewers during the period of rainfall, is known None of these Sanitary sewage Storm sewage Industrial waste None of these Sanitary sewage Storm sewage Industrial waste ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Flocculated particles do not change their None of these Weight Size Shape None of these Weight Size Shape ANSWER DOWNLOAD EXAMIANS APP