Waste Water Engineering In a fully mechanised composting plant, involves All of these Mechanized segregation Mechanized pulverising of refuse Mechanized receipt All of these Mechanized segregation Mechanized pulverising of refuse Mechanized receipt ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer that unloads the sewage at the point of treatment is called Branch sewer House sewer Main sewer Outfall sewer Branch sewer House sewer Main sewer Outfall sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Lateral sewer Sewer outfall House sewer Branch sewer Lateral sewer Sewer outfall House sewer Branch sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most widely used pump for lifting sewage is Centrifugal pump Air pressure pump Reciprocating pump Pneumatic ejector Centrifugal pump Air pressure pump Reciprocating pump Pneumatic ejector ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 20 days 30 days 10 days 60 days 20 days 30 days 10 days 60 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A five day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is 5000 1000 10000 100 5000 1000 10000 100 ANSWER DOWNLOAD EXAMIANS APP