Waste Water Engineering
In a fully mechanised composting plant, involves

Mechanized pulverising of refuse
Mechanized segregation
Mechanized receipt
All of these

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In septic tanks,

Free board of 0.3 m may be provided
All listed here
The baffles or tees are extended up to top level of scum
The clear space between the baffle top and covering slab is about 7.5 cm

ANSWER DOWNLOAD EXAMIANS APP