• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Waste Water Engineering

Waste Water Engineering
The formula V = (1/n) r2/3

Bazin’s formula
Chezy’s formula
Manning’s formula
Kutter’s formula

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at

Full depth
Half full
Two third full
Three fourth full

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The digested sludge from septic tanks, is removed after a maximum period of

3.5 years
4 years
3 years
5 years

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
For efficient working of a sewer, it must be ensured that

Neither (A) nor (B)
Minimum velocity of 0.45 m/sec, is maintained at its minimum flow
Both (A) and (B)
A maximum velocity of 0.90 m/sec, is maintained at its maximum flow

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The recommended detention period for grit chambers is

3 minutes
1 minute
2 minutes
5 minutes

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Disposal to sewage in large cities, is done in

Dilution
Purification
Irrigation
Oxidation

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑