Waste Water Engineering In a grit chamber of a sewage treatment plant, One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must be of adequate size to avoid over flow All listed here Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements Must be of adequate size to avoid over flow All listed here Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer pipe which carries sewage from a building for immediate disposal is House sewer Intercepting sewer Lateral sewer Main sewer House sewer Intercepting sewer Lateral sewer Main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level None of these Top of larger sewer is kept lower Top of smaller sewer is kept lower Tops of both the sewers are at the same level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which resists sulphide corrosion, is R.C. sewer Cast iron sewer Lead sewer Brick sewer R.C. sewer Cast iron sewer Lead sewer Brick sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The liquid wastes from kitchens, bath rooms and wash basins, is not called Sewage Liquid waste None of these Sullage Sewage Liquid waste None of these Sullage ANSWER DOWNLOAD EXAMIANS APP